Discipline specific behavior in a tee joint.

  1. While the HVAC discipline is active, click the (Connect Ducts/Pipes) tool, and set the Join with Tee option in the Connect Ducts/Pipes tool settings window. You may enter required Tolerance.
  2. Select the disconnected piece of duct first. Then select the duct in the connected run. A takeoff fitting is placed joining the two ducts.


  3. Similarly, while the plumbing discipline is active, activate the tool and select the disconnected piece of pipe first. Then select the pipe in the connected run. A tee fitting is placed joining the two pipes.